Project Description
TEP Africa answered that need with a shuttle racking system delivering 4,000 pallet positions, using powered shuttle carts to move pallets deep into storage lanes without the wasted aisle space of static racking. The result is a facility that stores more in the same footprint while getting product in and out faster — a storage solution engineered to match the tempo of one of the region’s busiest production lines.
Scope Delivered
- Installation of radio shuttle racking systems
- Plant infrastructure upgrades
- Maintenance and repair of industrial storage systems
- Safety installations including lifeline systems
- Fabrication and installation of industrial access structure



Testimonials
“ We have no hesitation in recommending Thermotech Engineering and Projects Ltd to any organisation seeking a reliable and skilled engineering contractor and partner.”
Coca-Cola
“ From start to finish, the Thermotech team was professional, well-organised, and maintained clear communication, ensuring minimal disruption to our day-to-day operations. The upgraded facility has greatly enhanced our working environment and fully meets our expectations.”
Coca-Cola
“ The electrical installations were executed to a high standard, ensuring full compliance with safety requirements and operational efficiency. The civil works were equally impressive, with the team demonstrating strong technical capability and workmanship throughout.”
Coca-Cola
“ We engaged Thermotech Engineering and Projects to carry out the electrical and civil works as part of the upgrade of our office building at our Spintex facility, and we are thoroughly pleased with the outcome.”
Coca-Cola
“ Thermotech has consistently demonstrated exceptional proficiency in meeting deadlines and ensuring the highest quality standards within budget. Their attention to detail and proactive approach to problem-solving have resulted in successful project outcomes that have exceeded our expectations.”


